Skip to Content
 Close search

Inquiries

Public inquiries and commissioned studies give the opportunity for all points of view in the community to be heard and considered. All individuals, firms, groups and organisations with an interest in an inquiry can participate in the inquiry.

Australian Academy of Technology and Engineering (ATSE) (PDF - 237k)

Submission DR144 for National Water Reform 2020 View full list


Submission to the Productivity Commission inquiry into the. National Water Reform 2020. Draft Report 24 March 2021. at se.o rg.a u. GPO Box 4055 Melbourne, 3001. VIC, Australia T 61 3 9864 0900 F 61 3 9864 0930 E info@atse.org.au. 1. NATIONAL WATER

Date received: 24 Mar 2021

AgForce Queensland Farmers Limited (PDF - 291k)

Submission DR143 for National Water Reform 2020 View full list


A D V A N C I N G S U S T A I N A B L E A G R I B U S I N E S S. GS/DM/GG04321. 23 March 2021. Jane Doolan, Commissioner National Water Reform inquiry Productivity Commission Locked Bag 2 Collins Street East MELBOURNE VIC 8003. By Email: water.reform

Date received: 24 Mar 2021

Michael Smit and Adam Jones (PDF - 390k)

Submission DR146 for National Water Reform 2020 View full list


Submission to National Water Reform Draft Report. Michael Smit, Technical and Sustainability Manager, Kingspan Water and Energy. Adam Jones, Principal Water Engineer, Water Efficiency Team Leader BMT. 24 March 2021. Thank you for the opportunity to

Date received: 24 Mar 2021

Mackay Conservation Group (PDF - 251k)

Submission DR150 for National Water Reform 2020 View full list


24 March 2021 National Water Reform 2020 Productivity Commission Locked Bag 2, Collins St, East Melbourne Victoria WA 8003 Email: water.reform.2020@pc.gov.au To whom it may concern, Re: Nation Water Reform 2020 Productivity Commission Draft Report

Date received: 24 Mar 2021

Queensland Farmers’ Federation (QFF) (PDF - 246k)

Submission DR161 for National Water Reform 2020 View full list


QUEENSLAND FARMERS’FEDERATION Primary Producers House, Level 3, 183 North Quay, Brisbane QLD 4000. PO Box 12009 George Street, Brisbane QLD 4003 qfarmers@qff.org.au | 07 3837 4720. ABN 44 055 764 488. The united voice of intensive and irrigated

Date received: 24 Mar 2021

North Queensland Conservation Council (NQCC) (PDF - 246k)

Submission DR157 for National Water Reform 2020 View full list


1. 114 Boundary Street Railway Estate, Townsville Q4810. PO Box 364, Townsville Q4810. campaigns@nqcc.org.au www.nqcc.org.au. ABN: 55 903 033 286. 24 March 2021 National Water Reform 2020 Productivity Commission Locked Bag 2, Collins St, East

Date received: 24 Mar 2021

Wentworth Group of Concerned Scientists (PDF - 281k)

Submission DR152 for National Water Reform 2020 View full list


1. 24 March 2021. Wentworth Group submission to the Productivity Commission, National Water Reform 2020, Draft. Report. We write to provide a submission to the Productivity Commission’s National Water Reform 2020. Draft Report. The Wentworth Group

Date received: 24 Mar 2021

NPF Industry Pty Ltd (NPFI) (PDF - 369k)

Submission DR155 for National Water Reform 2020 View full list


1. NPF Industry Pty Ltd (NPFI) Submission. on the. National Water Reform 2020 Productivity Commission Draft Report. (February 2021). Overview. This submission is made on behalf of the NPF Industry Pty Ltd (NPFI), the industry body which represents

Date received: 24 Mar 2021

Water for Indi (PDF - 273k)

Submission DR140 for National Water Reform 2020 View full list


Submission from Water for Indi group. regarding the National Water Reform 2020 – Productivity Commission. Draft Report. Purpose of Submission. • To review the findings of the National Water Reform 2020 – Productivity Commission Draft. report

Date received: 24 Mar 2021

NSW Irrigators’ Council (NSWIC) (PDF - 371k)

Submission DR158 for National Water Reform 2020 View full list


Level 5, 491 Kent Street, Sydney NSW 2000 PO Box Q640, Queen Victoria Building NSW 1230. Tel: 02 9264 3848 nswic@nswic.org.au. www.nswic.org.au. ABN: 49 087 281 746. Secure – Sustainable – Productive. SUBMISSION. Productivity Commission Review

Date received: 24 Mar 2021

Inquiries to show
Filter results
Submission Type
Inquiry : all → national water reform 2020
Date range