Skip to Content
 Close search

Inquiries

Public inquiries and commissioned studies give the opportunity for all points of view in the community to be heard and considered. All individuals, firms, groups and organisations with an interest in an inquiry can participate in the inquiry.

Origin (PDF - 150k)

Submission DR64 for Electricity Network Regulation View full list


Page 1 of 7. Origin (LGC) (Aust) Pty Limited ABN 73 000 000 331 Telephone Facsimile www.originenergy.com.au. 23 November 2012 The Commissioners The Productivity Commission Level 12, 530 Collins Street Melbourne VIC 3000, Australia By email:

Date received: 23 Nov 2012

Consumer Action Law Centre (PDF - 195k)

Submission DR79 for Electricity Network Regulation View full list


Consumer Action Law Centre Level 7, 459 Little Collins Street Telephone 03 9670 5088 info@consumeraction.org.au Melbourne Victoria 3000 Facsimile 03 9629 6898 www.consumeraction.org.au ABN 37 120 056 484 ACN 120 056 484. 23 November 2012. Lodged via

Date received: 23 Nov 2012

Energy Supply Association of Australia (PDF - 57k)

Submission DR70 for Electricity Network Regulation View full list


Energy Supply Association of Australia www.esaa.com.au ABN 98 052 416 083 Level 2 GPO Box 1823 P 61 3 9205 3100 451 Little Bourke St Melbourne F 61 3 9670 1069 Melbourne Victoria 3001 E info@esaa.com.au. 26 November 2012 Electricity Network

Date received: 23 Nov 2012

Energy Australia (PDF - 457k)

Submission DR82 for Electricity Network Regulation View full list


1 | P a g e. s. EnergyAustralia ABN 99 086 014 968. Level 33 385 Bourke Street Melbourne Victoria 3000 Phone 61 3 8628 1000 Facsimile 61 3 8628 1050 enq@energyaustralia.com.au energyaustralia.com.au. Dear Commissioners,. Electricity Network

Date received: 23 Nov 2012

Energy Retailers Association of Australia (PDF - 417k)

Submission DR76 for Electricity Network Regulation View full list


Energy Retailers Association of Australia Limited. Suite 3, Level 5, 189 Kent Street, SYDNEY NSW 2000. T (02) 8241 1800 F (02) 9251 5425 www.eraa.com.au. ABN 24 103 742 605. 23 November 2012 Philip Weickhardt Presiding Commissioner Electricity

Date received: 23 Nov 2012

AMP Capital (PDF - 332k)

Submission DR55 for Electricity Network Regulation View full list


AMP Capital Investors Limited ABN 59 001 777 591 AFSL 232497. Submission to the Productivity Commission. The Capital Efficiency of Australian Electricity Distributors. – Results of a Benchmarking Study. AMP Capital. NOVEMBER 2012. AMP CAPITAL. //

Date received: 23 Nov 2012

National Seniors Australia (PDF - 493k)

Submission DR62 for Electricity Network Regulation View full list


Submission in Response to the Productivity Commission Draft Report Electricity Network Regulation Frameworks November 2012. ii | P a g e. About National Seniors Australia. National Seniors Australia is the largest organisation representing

Date received: 23 Nov 2012

City of Sydney (PDF - 165k)

Submission DR58 for Electricity Network Regulation View full list


PRODUCTIVITY COMMISSION ELECTRICITY NETWORK REGULATORY FRAMEWORKS SUBMISSION (Rev 1) 1. SUBMISSION TO PRODUCTIVITY COMMISSION ON. ELECTRICITY NETWORK REGULATORY FRAMEWORKS Request for Submissions. This submission is made in response to the

Date received: 23 Nov 2012

Melbourne Energy Institute (PDF - 682k)

Submission DR73 for Electricity Network Regulation View full list


1. Electricity Network Regulation Public Inquiry. Submission to the Productivity Commissions’Draft Report. Authors:. Melbourne Energy Institute – Professor Mike Sandiford, Dr Roger Dargaville &Dylan McConnell School of Social and Political

Date received: 23 Nov 2012

SP AusNet (PDF - 242k)

Submission DR69 for Electricity Network Regulation View full list


SPI Electricity Pty Ltd ABN 91 064 651 118. A subsidiary of SP Australia Networks (Distribution) Pty Ltd. Level 31, 2 Southbank Boulevard Southbank Victoria 3006 Australia Locked Bag 14051 Melbourne City Mail Centre Victoria 8001. Australia. Tel 61

Date received: 23 Nov 2012